Soil & rebar test
SPT report plus rebar mill certs; the file gets a QR sticker you can scan.
SPT + mill certsAmin walks Tue & Fri mornings
Parcels read twice by the amin, verified once more by licensees, gate diary handed over personally — the rate card pins before every pour.
Section A–A · column grid 5×4
Drawing sheet
Partition desk
Rate card
Rs. 15,000per plot
Boundary, 4-side title and amin check-once.
Rs. 2,900per sq ft
Frame to handover with steel test dossier.
Rs. 1,600per sq ft
Interiors fit-out from bare shell.
Pour schedule
SPT report plus rebar mill certs; the file gets a QR sticker you can scan.
SPT + mill certsVendors set shutters; our engineer signs alignment before any concrete is ordered.
alignment signedOne unbroken pour day with cube tests at 7 and 28 days, results texted to you.
cube tests 7/28dSeven-day curing with stage bills released only after engineer sign-off, not before.
stage bill QRRate lock window
Book a plot this week and this quarter's steel rate holds — no mid-pour shake-ups.
Book survey
WhatsApp the plot location; survey with the amin runs the same week and the rate card arrives as one PDF, no phone-menu detour.
Survey request
Form 7-BPlot location
Ward + street, or drop the pin on WhatsApp
Access
Road width, gate side, any river stone walls
Survey day
Amin walks Tue & Fri mornings · results same week
Rate card + steel quote arrive as one PDF