PANA
TemplatesPricingTry itHow it worksAboutFAQ
Log inTry PANA
← BackNirmanConstruction
HomeProjectsPlots
desktoptabletmobile
Use this template
Layouts
NavbarHeroServicesProcessGalleryPricingTestimonialsContactFooter
MinimalSolid
⌂NIRMAN
StreamsSitesPour scheduleRate cardHomeProjectsPlots

Handover minutes, kept on file

Buildings we stamped, sorted by street

Thirty-one buildings with steel test dossiers QR-pinned per pour — walk any street on this list and the committee will point at our slab.

Book survey
01 — Buildings stamped
31
02 — Lathing court cases
0
03 — Slabs poured
4.2k
SLAB LAYOUT · REV C1:200 · A1

Section A–A · column grid 5×4

Drawing sheet

◀ Site ledger

Site ledger

Slabs we've poured this decade

PRINT 01Sunsari mill01PRINT 02Tower B slab02PRINT 03Retaining wall03PRINT 04Plot 14 gate04PRINT 05Shop rebar bay05PRINT 06Handover day06

Owner's minutes

Signed on handover day

“
Steel test dossier had QR codes for every pour. My bank laughed because it had never seen one.
Aayush · Baluwatar duplex
“
Title checked thrice, amin walked twice; the gate diary was the cleanest I've signed.
Aayush · Sunakothi plots
“
One supervisor, one invoice, and calls answered at 8:40pm on a Tuesday.
Aayush · Interior, Chabahil

Projects desk

Ask for a ledger, not a brochure

Name the street or the committee; we hand over the Pour & Cure ledger for that building — cube-test results included, unedited.

Field desk
01-4351420
Yard
Gongabu depot yard, Kathmandu
Desk mail
desk@nirman.com.np

Survey request

Form 7-B
01

Plot location

Ward + street, or drop the pin on WhatsApp

02

Access

Road width, gate side, any river stone walls

03

Survey day

Amin walks Tue & Fri mornings · results same week

Call the field desk

Rate card + steel quote arrive as one PDF

⌂NIRMAN

Field desk 6am–5pm · sampling from the gate diary
HomeProjectsPlots

■ 31 buildings stamped · 0 lathing cases

2026 Nirman Builders

Pana By DMK Group