PANA
TemplatesPricingTry itHow it worksAboutFAQ
Log inTry PANA
← BackNirmanConstruction
HomeProjectsPlots
desktoptabletmobile
Use this template
Layouts
NavbarHeroServicesProcessGalleryPricingTestimonialsContactFooter
MinimalSolid
⌂NIRMANBuilders · Plotters · Est. 1996
StreamsSitesPour scheduleRate cardHomeProjectsPlots
Book survey

Site survey runs Mon–Sat

Chaar aana flats drawn on honest paper

Turnkey apartment builds on two-acre lots, 4-anna partitions with titles checked three times, and steel rates pinned quarterly before every pour.

Walk the plotsSteel & pour rate card
01 — Buildings stamped
31
02 — Lathing court cases
0
03 — Slabs concrete poured
4.2k
SLAB LAYOUT · REV C1:200 · A1

Section A–A · column grid 5×4

Drawing sheet

◀ Tower B top-slab done in Asar

Work streams

RCC, plinth and paperwork

Stream01

RCC frame builds

Apartment frames with steel tests attached per pour; slabs cured on schedule, not on request.

Rs. 2.9k / sq ft

Stream02

4-anna plotting

Land parcels read by our amin twice, titles verified thrice, gate diary handed over personally.

From Rs. 42 lakh / plot

Stream03

Turnkey interior finish

Plumbing, wiring, plank and paint — one invoice, one supervisor who answers after 8pm.

Rs. 1.6k / sq ft

Pour schedule

How a slab actually happens

01

Soil & rebar test

SPT report plus rebar mill certs; the file gets a QR sticker you can scan.

SPT + mill certs
02

Formwork day

Vendors set shutters; our engineer signs alignment before any concrete is ordered.

alignment signed
03

The pour

One unbroken pour day with cube tests at 7 and 28 days, results texted to you.

cube tests 7/28d
04

Cure & stage bill

Seven-day curing with stage bills released only after engineer sign-off, not before.

stage bill QR

Rate lock window

Book a plot this week and this quarter's steel rate holds — no mid-pour shake-ups.

Rate lock ends · soonBook plot

Site ledger

Slabs we've poured this decade

PRINT 01Sunsari mill01PRINT 02Tower B slab02PRINT 03Retaining wall03PRINT 04Plot 14 gate04PRINT 05Shop rebar bay05PRINT 06Handover day06

Rate card

Build costs, printed plainly

Plot Survey

01

Rs. 15,000per plot

Boundary, 4-side title and amin check-once.

  • ■SPT add-on option
  • ■Boundary pillar mark
  • ■Two reruns free
Book plot survey
Most booked

RCC Build Pack

02

Rs. 2,900per sq ft

Frame to handover with steel test dossier.

  • ■Mill cert per pour
  • ■Cube-test QR dossier
  • ■Stage-billed payment
Book plot survey

Turnkey Finish

03

Rs. 1,600per sq ft

Interiors fit-out from bare shell.

  • ■One supervisor
  • ■Plumbing + wiring maps
  • ■1-year snag cover
Book plot survey

Owner's minutes

Signed on handover day

“
Steel test dossier had QR codes for every pour. My bank laughed because it had never seen one.
Aayush · Baluwatar duplex
“
Title checked thrice, amin walked twice; the gate diary was the cleanest I've signed.
Aayush · Sunakothi plots
“
One supervisor, one invoice, and calls answered at 8:40pm on a Tuesday.
Aayush · Interior, Chabahil

Book survey

Book a site survey

WhatsApp the plot location and we schedule a survey with the amin the same week; results, rate card and steel quote arrive as one PDF.

Field desk
01-4351420
Yard
Gongabu depot yard, Kathmandu
Desk mail
desk@nirman.com.np

Survey request

Form 7-B
01

Plot location

Ward + street, or drop the pin on WhatsApp

02

Access

Road width, gate side, any river stone walls

03

Survey day

Amin walks Tue & Fri mornings · results same week

Call the field desk

Rate card + steel quote arrive as one PDF

⌂NIRMAN

Field desk 6am–5pm · sampling from the gate diary
HomeProjectsPlots

■ 31 buildings stamped · 0 lathing cases

2026 Nirman Builders

Pana By DMK Group